Refurbishment of masonry tunnels through the example of the Kirchberg Tunnel for the DB Netz AG
Author(s): |
Patrick Meyer
Ludwig Wiesmeier Martin Jäntschke |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geomechanics and Tunnelling, October 2017, n. 5, v. 10 |
Page(s): | 497-506 |
DOI: | 10.1002/geot.201700022 |
- About this
data sheet - Reference-ID
10084137 - Published on:
09/10/2018 - Last updated on:
18/10/2018