Refuerzo de los tableros de la N-III sobre los aliviaderos de la presa de Alarcón

Author(s):




Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 269, v. 64
Page(s): 77-98
Abstract:

Strengthening the decks on road N-III over Alarcón Dam spillways

In 2009/2011, Alarcón Dam, built in 1955, a series of operations were undertaken to adapt it to the existing legislation, including, among others, a full remodel of the three decks that span the spillways, installation of new sluices, rehabilitation of dam parameters, upgrading of electrical facilities and reform of facilities and galleries.Construcciones ALPI, awardee of the general contract, subcontracted Freyssinet to strengthen the decks and widen the N-III carriageway, further to a design authored by VALTER. This article focuses on the works subcontracted, analysing the needs that occasioned the operations and the reasons for the changes made in the original design. The engineering performed for those variations are briefly described, along with the technical principles and construction particulars that had to be taken into consideration during the works.

Keywords:
post-tensioning dam structural strengthening top bracing

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075514
  • Published on:
    30/09/2018
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine