Rail and Road Traffic Continue During Bridge Modification

Author(s):
Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 3, v. 54
Page(s): 55-57
Abstract:

The crossing of Route 15 under the Bangor and Aroostook Railroad Bridge, Bangor, Maine had limited sight distance and marginal clearances. Maine Department of Transportation, therefore, proposed to reconstruct Route 15 at the crossing to improve horizontal and vertical alignment. A preliminary engineering study recommended modifying a portion of the bridge abutment to have Route 15 pass with an acceptable alignment. This included removal and reconstruction of the north abutment wingwall without any disruption to rail traffic. This was accomplished by constructing the new wing in two parts. The far end part was built first. The coffer dam to retain railroad embankment spanned between this part and the existing abutment. Excavation in front of the coffer dam was then completed and the remainder of the wing wall was constructed.

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10015635
  • Published on:
    25/07/2004
  • Last updated on:
    14/08/2014
 
Structurae cooperates with