0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Rail and Road Traffic Continue During Bridge Modification

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Civil Engineering Magazine, , n. 3, v. 54
Page(s): 55-57
Abstrait:

The crossing of Route 15 under the Bangor and Aroostook Railroad Bridge, Bangor, Maine had limited sight distance and marginal clearances. Maine Department of Transportation, therefore, proposed to reconstruct Route 15 at the crossing to improve horizontal and vertical alignment. A preliminary engineering study recommended modifying a portion of the bridge abutment to have Route 15 pass with an acceptable alignment. This included removal and reconstruction of the north abutment wingwall without any disruption to rail traffic. This was accomplished by constructing the new wing in two parts. The far end part was built first. The coffer dam to retain railroad embankment spanned between this part and the existing abutment. Excavation in front of the coffer dam was then completed and the remainder of the wing wall was constructed.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10015635
  • Publié(e) le:
    25.07.2004
  • Modifié(e) le:
    14.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine