0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Quantitative analysis method for the importance of stress influencing factors of a high arch dam during the operation period using SPA–OSC–PLS

Author(s): ORCID (Engineering Safety and Disaster Prevention Department Changjiang River Scientific Research Institute Wuhan Hubei China)
(Engineering Safety and Disaster Prevention Department Changjiang River Scientific Research Institute Wuhan Hubei China)
(China Three Gorges Construction Engineering Corporation Chengdu Sichuan China)
(China Yangtze Power Co., Ltd Chengdu Sichuan China)
(Engineering Safety and Disaster Prevention Department Changjiang River Scientific Research Institute Wuhan Hubei China)
Medium: journal article
Language(s): English
Published in: Structural Control and Health Monitoring, , n. 11, v. 29
DOI: 10.1002/stc.3087
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stc.3087.
  • About this
    data sheet
  • Reference-ID
    10690869
  • Published on:
    24/09/2022
  • Last updated on:
    18/11/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine