0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Quantitative analysis method for the importance of stress influencing factors of a high arch dam during the operation period using SPA–OSC–PLS

Auteur(s): ORCID (Engineering Safety and Disaster Prevention Department Changjiang River Scientific Research Institute Wuhan Hubei China)
(Engineering Safety and Disaster Prevention Department Changjiang River Scientific Research Institute Wuhan Hubei China)
(China Three Gorges Construction Engineering Corporation Chengdu Sichuan China)
(China Yangtze Power Co., Ltd Chengdu Sichuan China)
(Engineering Safety and Disaster Prevention Department Changjiang River Scientific Research Institute Wuhan Hubei China)
Médium: article de revue
Langue(s): anglais
Publié dans: Structural Control and Health Monitoring, , n. 11, v. 29
DOI: 10.1002/stc.3087
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1002/stc.3087.
  • Informations
    sur cette fiche
  • Reference-ID
    10690869
  • Publié(e) le:
    24.09.2022
  • Modifié(e) le:
    18.11.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine