Quantitative analysis method for the importance of stress influencing factors of a high arch dam during the operation period using SPA–OSC–PLS
Auteur(s): |
Bo Li
(Engineering Safety and Disaster Prevention Department Changjiang River Scientific Research Institute Wuhan Hubei China)
Xiao Han (Engineering Safety and Disaster Prevention Department Changjiang River Scientific Research Institute Wuhan Hubei China) Mengdi Yao (China Three Gorges Construction Engineering Corporation Chengdu Sichuan China) Jingjie Tian (China Yangtze Power Co., Ltd Chengdu Sichuan China) Qian Zheng (Engineering Safety and Disaster Prevention Department Changjiang River Scientific Research Institute Wuhan Hubei China) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structural Control and Health Monitoring, septembre 2022, n. 11, v. 29 |
DOI: | 10.1002/stc.3087 |
- Informations
sur cette fiche - Reference-ID
10690869 - Publié(e) le:
24.09.2022 - Modifié(e) le:
18.11.2022