0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Quantifying Project Uncertainties: Leveraging Historical Bid and Change Order Data for Automated Detection of Cost and Schedule Impacts in New Projects

This publication lists 27 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10815029
  • Published on:
    03/02/2025
  • Last updated on:
    03/02/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine