0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Quantifying Project Uncertainties: Leveraging Historical Bid and Change Order Data for Automated Detection of Cost and Schedule Impacts in New Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/jcemd4.coeng-15689.
  • About this
    data sheet
  • Reference-ID
    10815029
  • Published on:
    03/02/2025
  • Last updated on:
    03/02/2025
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine