Pull-out behavior of the pre-installed lifting anchor with supplementary reinforcement for the precast concrete segments of wind turbine hybrid towers
Author(s): |
Wei Ren
Xu-Hong Zhou Jing-Shen Wang Yu-Hang Wang Ji-Ke Tan Ran Deng Yao Lu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering Structures, March 2024, v. 303 |
Page(s): | 117547 |
DOI: | 10.1016/j.engstruct.2024.117547 |
- About this
data sheet - Reference-ID
10758265 - Published on:
15/03/2024 - Last updated on:
15/03/2024