Pull-out behavior of the pre-installed lifting anchor with supplementary reinforcement for the precast concrete segments of wind turbine hybrid towers
Auteur(s): |
Wei Ren
Xu-Hong Zhou Jing-Shen Wang Yu-Hang Wang Ji-Ke Tan Ran Deng Yao Lu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering Structures, mars 2024, v. 303 |
Page(s): | 117547 |
DOI: | 10.1016/j.engstruct.2024.117547 |
- Informations
sur cette fiche - Reference-ID
10758265 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024