Puente arco sobre la línea de alta velocidad Córdoba-Málaga. Condicionantes dinámicos y constructivos para el diseño
Author(s): |
Alejandro Castillo Linares
Mariano Villameriel Fernández Guillermo Montero Poyatos Mario García Ramírez Juan de Dios Moreno Jiménez Alejandro Martínez Castro |
---|---|
Medium: | journal article |
Language(s): | Spanish |
Published in: | Hormigón y acero, 4th Quarter 2010, n. 258, v. 61 |
Page(s): | 25-42 |
Abstract: |
Bow-string bridge on Cordoba-Malaga high speed railway. Dynamic and constructional conditioning factorsThe New High Speed Line belonging to the Platform Duplication Project of Andalucía Cross-sectional Railway Axis, crosses the existing High Speed Line Cordoba-Malaga close to the town of Santa Ana (Antequera), with significant skew. This, in addition to the rules marked by ADIF on minimum horizontal and vertical patterns to respect in good conditions for the inferior route, forces the bridge holding the new railway route to have a central span length superior to 85 m. Between the possible structural solutions, and after the accomplishment of a laborious dynamic study, a bow-string bridge is finally decided, holding a main span of 86,40 m long, and access spans of 32,40 and 27,0 m to both sides of the central one, so that its overall length is 205,20 m (27,0 + 32,40 + 86,40 + 32,40 + 27,0 m). |
Keywords: |
composite structure dynamic analysis high speed bow-string semianalytical method
|
Available from: |