0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Proyecto y construcción del cierre del ábside de la Sagrada Familia

Author(s):






Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 256, v. 61
Page(s): 5-38
Abstract:

Design and construction of the apse on the ?Sagrada Familia?

The Expiatory Temple of the Holy Family has now been under construction for over 125 years. Construction on the façade enclosing the apse has recently been resumed, from elevation + 45,00 to + 64,00 m. Work has also begun on the central hyperboloid. This element springs from an inclined plane, between elevations + 60,00 and + 64,00 m, and extends upward to elevation + 77,00 m at the centre of the apse. The pages that follow provide a comprehensive overview of a number of questions respecting the design, engineering, construction and materials involved, as well the innovations implemented, to respond adequately to this challenging endeavour.

Keywords:
construction Sagrada Familia Gaudí apse structure and materials
Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075575
  • Published on:
    09/04/2018
  • Last updated on:
    09/04/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine