Proyecto del tramo atirantado del Puente de la Constitución de 1812 sobre la bahía de Cádiz

Author(s):



Medium: journal article
Language(s): English, Spanish
Published in: Hormigón y acero, , n. 278-279, v. 67
Page(s): 71-85
DOI: 10.1016/j.hya.2016.03.003
Abstract:

Design of the Constitución de 1812 cable-stayed Bridge over the Cadiz Bay

The 1812 Constitution cable-stayed bridge over Cadiz Bay includes a total length of 1,180m, and covers the main span of 540m between the towers, two back spans of 200m long, and two partially cable-stayed spans 120m long.The cable-stayed bridge, with its maximum span has determined the design of the whole bridge. The design criteria for both vertical and horizontal loads are shown. The specific concepts for the composite steel-concrete cross section, precast slabs, cable-stays, bearing devices, and expansion joints are explained.

Keywords:
cable-stayed bridge Composite steel-concrete cross section Stays bearing devices Precast concrete slab

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.hya.2016.03.003.
  • About this
    data sheet
  • Reference-ID
    10075451
  • Published on:
    27/03/2018
  • Last updated on:
    07/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine