Proyecto del tramo atirantado del Puente de la Constitución de 1812 sobre la bahía de Cádiz

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch, Spanisch
Veröffentlicht in: Hormigón y acero, , n. 278-279, v. 67
Seite(n): 71-85
DOI: 10.1016/j.hya.2016.03.003
Abstrakt:

Design of the Constitución de 1812 cable-stayed Bridge over the Cadiz Bay

The 1812 Constitution cable-stayed bridge over Cadiz Bay includes a total length of 1,180m, and covers the main span of 540m between the towers, two back spans of 200m long, and two partially cable-stayed spans 120m long.The cable-stayed bridge, with its maximum span has determined the design of the whole bridge. The design criteria for both vertical and horizontal loads are shown. The specific concepts for the composite steel-concrete cross section, precast slabs, cable-stays, bearing devices, and expansion joints are explained.

Stichwörter:
Schrägseilbrücke

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1016/j.hya.2016.03.003.
  • Über diese
    Datenseite
  • Reference-ID
    10075451
  • Veröffentlicht am:
    27.03.2018
  • Geändert am:
    07.10.2018
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine