Probabilistic simulation for developing likelihood distribution of engineering project cost
Author(s): |
Jui-Sheng Chou
I-Tung Yang Wai Kiong Chong |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, August 2009, n. 5, v. 18 |
Page(s): | 570-577 |
DOI: | 10.1016/j.autcon.2008.12.001 |
- About this
data sheet - Reference-ID
10189040 - Published on:
10/12/2018 - Last updated on:
10/12/2018