-
Hsu, Ting-Yu / Lu, Meng-Chen / Yang, I-Tung / Kim, Chul-Woo / Chang, Kai-Chun (2024): Damage detection of truss bridge elements using an enhanced pseudo-local flexibility method. In: Journal of Civil Structural Health Monitoring, v. 14, n. 3 (January 2024).
https://doi.org/10.1007/s13349-023-00742-0
-
Yang, I-Tung / Prayogo, Handy (2022): Efficient Reliability Analysis of Structures Using Symbiotic Organisms Search-Based Active Learning Support Vector Machine. In: Buildings, v. 12, n. 4 (11 April 2022).
https://doi.org/10.3390/buildings12040455
-
Lee, Hsin-Yun / Yang, I-Tung / Lin, Yu-Cheng (2012): Laying out the occupant flows in public buildings for operating efficiency. In: Building and Environment, v. 51 (May 2012).
https://doi.org/10.1016/j.buildenv.2011.11.005
-
Lin, Yu-Cheng / Lee, Hsin-Yun / Yang, I-Tung (2016): Developing As-built BIM Model Process Management System for General Contractors: A Case Study. In: Journal of Civil Engineering and Management, v. 22, n. 5 (May 2016).
https://doi.org/10.3846/13923730.2014.914081
-
Wang, Wei-Chih / Yu, Wen-der / Yang, I-Tung / Lin, Chun-Chang / Lee, Ming-Tsung / Cheng, Yuan-Yuan (2013): Applying the Ahp To Support the Best-value Contractor Selection – Lessons Learned From Two Case Studies in Taiwan. In: Journal of Civil Engineering and Management, v. 19, n. 1 (October 2013).
https://doi.org/10.3846/13923730.2012.734851
-
Chou, Jui-Sheng / Cheng, Min-Yuan / Hsieh, Yo-Min / Yang, I-Tung / Hsu, Hsin-Ting (2019): Optimal path planning in real time for dynamic building fire rescue operations using wireless sensors and visual guidance. In: Automation in Construction, v. 99 (March 2019).
https://doi.org/10.1016/j.autcon.2018.11.020
-
Everett, John G. / Yang, I-Tung (1997): Workers' Comp. Premiums: Disparities in Penalties for Identical Losses. In: Journal of Construction Engineering and Management, v. 123, n. 3 (September 1997).
https://doi.org/10.1061/(asce)0733-9364(1997)123:3(312)
-
Yang, I-Tung (2007): Risk Modeling of Dependence among Project Task Durations. In: Computer-Aided Civil and Infrastructure Engineering, v. 22, n. 6 (August 2007).
https://doi.org/10.1111/j.1467-8667.2007.00497.x
-
Yang, I-Tung / Hsieh, Yi-Hung / Kuo, Chyi-Gang (2016): Integrated multiobjective framework for reliability-based design optimization with discrete design variables. In: Automation in Construction, v. 63 (March 2016).
https://doi.org/10.1016/j.autcon.2015.12.010
-
Hsie, Machine / Chang, Ching-Jung / Yang, I-Tung / Huang, Chun-Yen (2009): Resource-constrained scheduling for continuous repetitive projects with time-based production units. In: Automation in Construction, v. 18, n. 7 (November 2009).
https://doi.org/10.1016/j.autcon.2009.04.006
-
Yang, I-Tung / Hsieh, Yi-Hung (2011): Reliability-based design optimization with discrete design variables and non-smooth performance functions: AB-PSO algorithm. In: Automation in Construction, v. 20, n. 5 (August 2011).
https://doi.org/10.1016/j.autcon.2010.12.003
-
Yang, I-Tung / Wang, Wei-Chih / Yang, Tzu-I (2012): Automatic repair of inconsistent pairwise weighting matrices in analytic hierarchy process. In: Automation in Construction, v. 22 (March 2012).
https://doi.org/10.1016/j.autcon.2011.09.004
-
Chou, Jui-Sheng / Yang, I-Tung / Chong, Wai Kiong (2009): Probabilistic simulation for developing likelihood distribution of engineering project cost. In: Automation in Construction, v. 18, n. 5 (August 2009).
https://doi.org/10.1016/j.autcon.2008.12.001
-
Yang, I-Tung (2011): Stochastic time–cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance. In: Automation in Construction, v. 20, n. 7 (November 2011).
https://doi.org/10.1016/j.autcon.2011.03.008
-
Cheng, Min-Yuan / Chiu, Kuan-Chang / Hsieh, Yo-Ming / Yang, I-Tung / Chou, Jui-Sheng / Wu, Yu-Wei (2017): BIM integrated smart monitoring technique for building fire prevention and disaster relief. In: Automation in Construction, v. 84 (December 2017).
https://doi.org/10.1016/j.autcon.2017.08.027
-
Yang, I-Tung / Lin, Yu-Cheng / Lee, Hsin-Yun (2014): Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off. In: Journal of Construction Engineering and Management, v. 140, n. 1 (January 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000784
-
Ioannou, Photios G. / Yang, I-Tung (2016): Repetitive Scheduling Method: Requirements, Modeling, and Implementation. In: Journal of Construction Engineering and Management, v. 142, n. 5 (May 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001107
-
Yang, I-Tung (2008): Distribution-Free Monte Carlo Simulation: Premise and Refinement. In: Journal of Construction Engineering and Management, v. 134, n. 5 (May 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:5(352)
-
Yang, I-Tung (2007): Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis. In: Journal of Construction Engineering and Management, v. 133, n. 7 (July 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:7(498)
-
Yang, I-Tung (2005): Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability. In: Journal of Construction Engineering and Management, v. 131, n. 9 (September 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:9(1002)
-
Yang, I-Tung / Hsieh, Yo-Ming / Kung, Li-Ou (2012): Parallel Computing Platform for Multiobjective Simulation Optimization of Bridge Maintenance Planning. In: Journal of Construction Engineering and Management, v. 138, n. 2 (February 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000421