A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules
Author(s): |
M. Poshdar
V. A. González G. M. Raftery F. Orozco J. S. Romeo E. Forcael |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, October 2016, n. 10, v. 142 |
Page(s): | 04016046 |
DOI: | 10.1061/(asce)co.1943-7862.0001158 |
- About this
data sheet - Reference-ID
10170523 - Published on:
11/12/2018 - Last updated on:
11/12/2018