A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules
Auteur(s): |
M. Poshdar
V. A. González G. M. Raftery F. Orozco J. S. Romeo E. Forcael |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, octobre 2016, n. 10, v. 142 |
Page(s): | 04016046 |
DOI: | 10.1061/(asce)co.1943-7862.0001158 |
- Informations
sur cette fiche - Reference-ID
10170523 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018