V. A. González
- Barriers to adopting simulation modelling in construction industry. Dans: Automation in Construction, v. 111 (mars 2020). (2020):
- A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules. Dans: Journal of Construction Engineering and Management, v. 142, n. 10 (octobre 2016). (2016):
- Characterization of Process Variability in Construction. Dans: Journal of Construction Engineering and Management, v. 140, n. 11 (novembre 2014). (2014):