Prioritizing complexity using fuzzy DANP: case study of international development projects
Author(s): |
Soo Yong Kim
Minh V. Nguyen Tuyen T. N. Dao |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, 2021, n. 4, v. 28 |
Page(s): | 1114-1133 |
DOI: | 10.1108/ecam-04-2020-0265 |
Abstract: |
PurposeThis paper aims to propose a comprehensive framework for prioritizing complexity criteria. The framework was validated by applying in infrastructure international development (ID) project as a case study. Design/methodology/approachA literature review highlighted the limitations of existing complexity prioritization methods. Then, a combination of the fuzzy decision-making trial and evaluation laboratory (DEMATEL) and fuzzy analytic network process (ANP) was employed as a foundation to develop a three-stage complexity prioritization framework. Focus group discussion and questionnaire surveys were used to practically test the framework in the infrastructure ID projects. FindingsThe three-stage complexity prioritization framework was validated to be reliable and feasible. The findings showed ability of consultants, scope uncertainties, site compensation and clearance, communication between stakeholders, administrative procedure and project duration were the most significant complexity criteria of ID projects in the Vietnamese context. Practical implicationsThe framework is a robust tool that enables the researchers to grasp the interaction of complexity criteria for complexity prioritization. Later studies can apply the proposed framework, with some minor revisions, to assess the interaction of criteria in other research topics in, and beyond, project complexity. Results of the case study suggest project stakeholders focusing on complex interactions among criteria to reduce project complexity. Originality/valueThis study contributes to the body of knowledge by providing a comprehensive complexity prioritization framework that grasps the interrelationship of complexity criteria. For stakeholders of ID projects, the findings provide insightful perspectives to understand complexity, which can help to enhance project performance. |
- About this
data sheet - Reference-ID
10577028 - Published on:
26/02/2021 - Last updated on:
08/05/2021