Prioritizing complexity using fuzzy DANP: case study of international development projects

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 4, v. 28
Page(s): 1114-1133
DOI: 10.1108/ecam-04-2020-0265
Abstrait:

Purpose

This paper aims to propose a comprehensive framework for prioritizing complexity criteria. The framework was validated by applying in infrastructure international development (ID) project as a case study.

Design/methodology/approach

A literature review highlighted the limitations of existing complexity prioritization methods. Then, a combination of the fuzzy decision-making trial and evaluation laboratory (DEMATEL) and fuzzy analytic network process (ANP) was employed as a foundation to develop a three-stage complexity prioritization framework. Focus group discussion and questionnaire surveys were used to practically test the framework in the infrastructure ID projects.

Findings

The three-stage complexity prioritization framework was validated to be reliable and feasible. The findings showed ability of consultants, scope uncertainties, site compensation and clearance, communication between stakeholders, administrative procedure and project duration were the most significant complexity criteria of ID projects in the Vietnamese context.

Practical implications

The framework is a robust tool that enables the researchers to grasp the interaction of complexity criteria for complexity prioritization. Later studies can apply the proposed framework, with some minor revisions, to assess the interaction of criteria in other research topics in, and beyond, project complexity. Results of the case study suggest project stakeholders focusing on complex interactions among criteria to reduce project complexity.

Originality/value

This study contributes to the body of knowledge by providing a comprehensive complexity prioritization framework that grasps the interrelationship of complexity criteria. For stakeholders of ID projects, the findings provide insightful perspectives to understand complexity, which can help to enhance project performance.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-04-2020-0265.
  • Informations
    sur cette fiche
  • Reference-ID
    10577028
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    08.05.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine