0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Predicting the Duration of a General Contracting Industrial Project based on the Residual Modified Model

This publication has been cited in the following 2 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10314729
  • Published on:
    28/06/2019
  • Last updated on:
    22/07/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine