Predicting the Duration of a General Contracting Industrial Project based on the Residual Modified Model
Author(s): |
Jian-Xia Guo
Chang-Ming Hu Rong Bao |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | KSCE Journal of Civil Engineering, June 2019, n. 8, v. 23 |
Page(s): | 3275-3284 |
DOI: | 10.1007/s12205-019-1543-7 |
- About this
data sheet - Reference-ID
10314729 - Published on:
28/06/2019 - Last updated on:
22/07/2019