Predicting the Duration of a General Contracting Industrial Project based on the Residual Modified Model

Author(s):


Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 8, v. 23
Page(s): 3275-3284
DOI: 10.1007/s12205-019-1543-7