0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Predicting construction cost overruns using text mining, numerical data and ensemble classifiers

This publication lists 17 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10190384
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine