0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Predicting construction cost overruns using text mining, numerical data and ensemble classifiers

Author(s):

Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 43
Page(s): 23-29
DOI: 10.1016/j.autcon.2014.02.014
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2014.02.014.
  • About this
    data sheet
  • Reference-ID
    10190384
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine