0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Precast Segmental Technology in Bangkok - 300 km of Viaducts

Author(s):
Medium: journal article
Language(s): English
Published in: Structural Engineering International, , n. 4, v. 11
Page(s): 261-264
DOI: 10.2749/101686601780346788
Abstract:

In the 1980s, Bangkok was taken by a fever of demolition and reconstruction fueled by speculative real state business that marked the beginning of a cycle of explosive growth. This change was too extreme and the city sunk under a flood of air pollution, noise and the worst traffic jams of our times. This led the authorities to launch, by the end of the 1980s, one of the most ambitious programs of urban transportation in the region. The three projects presented in the article, are exceptional by their size, by the specific process that conditioned their conception and development, and by their interface within the city. The projects constructed in Bangkok during the last decade, brings an exemplary solution to the problem of construction of urban transportation infrastructure, in large metropolises of developing countries.

Geographic Locations

  • About this
    data sheet
  • Reference-ID
    10003879
  • Published on:
    20/09/2002
  • Last updated on:
    28/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine