0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Precast Segmental Technology in Bangkok - 300 km of Viaducts

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 4, v. 11
Seite(n): 261-264
DOI: 10.2749/101686601780346788
Abstrakt:

In the 1980s, Bangkok was taken by a fever of demolition and reconstruction fueled by speculative real state business that marked the beginning of a cycle of explosive growth. This change was too extreme and the city sunk under a flood of air pollution, noise and the worst traffic jams of our times. This led the authorities to launch, by the end of the 1980s, one of the most ambitious programs of urban transportation in the region. The three projects presented in the article, are exceptional by their size, by the specific process that conditioned their conception and development, and by their interface within the city. The projects constructed in Bangkok during the last decade, brings an exemplary solution to the problem of construction of urban transportation infrastructure, in large metropolises of developing countries.

Geografische Orte

  • Über diese
    Datenseite
  • Reference-ID
    10003879
  • Veröffentlicht am:
    20.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine