0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Point-Cloud-Based Comparison between Construction Schedule and As-Built Progress: Long-Range Three-Dimensional Laser Scanner's Approach

This publication has been cited in the following 9 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10140704
  • Published on:
    12/11/2018
  • Last updated on:
    19/02/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine