Point-Cloud-Based Comparison between Construction Schedule and As-Built Progress: Long-Range Three-Dimensional Laser Scanner's Approach
Author(s): |
Naai-Jung Shih
Ping-Hung Wang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Architectural Engineering (ASCE), September 2004, n. 3, v. 10 |
Page(s): | 98-102 |
DOI: | 10.1061/(asce)1076-0431(2004)10:3(98) |
- About this
data sheet - Reference-ID
10140704 - Published on:
12/11/2018 - Last updated on:
19/02/2019