Planungswettbewerb Süderelbebrücke Moorburg
Bericht zu Durchführung und Ergebnis des Realisierungswettbewerbs
Author(s): |
Karl-Heinz Reintjes
|
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, February 2014, n. 2, v. 91 |
Page(s): | 114-122 |
DOI: | 10.1002/bate.201300100 |
Abstract: |
Design competition Süderelbe bridge Moorburg - Report on execution and result of the realization competitionThe bridge across the Süderelbe will be the key structure of the projected extension of the federal motorway A 26, which in future will link the A 7 with the A 1 in the south of the Hamburg harbor. |
Keywords: |
cable-stayed bridge design competition 350 m main span
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10069743 - Published on:
14/02/2014 - Last updated on:
30/09/2018