0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Planungswettbewerb Süderelbebrücke Moorburg

Bericht zu Durchführung und Ergebnis des Realisierungswettbewerbs

Author(s):
Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 2, v. 91
Page(s): 114-122
DOI: 10.1002/bate.201300100
Abstract:

Design competition Süderelbe bridge Moorburg - Report on execution and result of the realization competition

The bridge across the Süderelbe will be the key structure of the projected extension of the federal motorway A 26, which in future will link the A 7 with the A 1 in the south of the Hamburg harbor.
The possible corridor for the alignment of the A 26 across the Süderelbe is confined tightly. The power plant Moorburg, the harbor Hohe Schaar, several industry areas, roads, a railway line lead stringently to a crossing in the neighborhood of the existing Kattwyk Bridge. So, a difficult setting of tasks is given for the design of the bridge.
A competition was initiated to find the best design and solution for realization. In May 2013, a jury of clients and experts assessed the works of the twelve participants. The winner is a cable-stayed bridge with two pylons, a main span of 350 m and of a generally approved aesthetic design. Characteristic elements are a dual superstructure and split pylons.
Under the other works of the competition are inspirational designs of aesthetical or technical interest, too.

Keywords:
cable-stayed bridge design competition 350 m main span
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201300100.
  • About this
    data sheet
  • Reference-ID
    10069743
  • Published on:
    14/02/2014
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine