Performance of constructing a double-deck subway station by combining the shield method and cavern–pile method
Author(s): |
Mingju Zhang
Yi Liu Lifeng Fan Pengfei Li |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, August 2017, v. 67 |
Page(s): | 120-131 |
DOI: | 10.1016/j.tust.2017.05.002 |
- About this
data sheet - Reference-ID
10089562 - Published on:
07/12/2018 - Last updated on:
07/12/2018