Author(s): |
J. Manterola Armisén
L. Fernández Troyano J. Montero López |
---|---|
Medium: | journal article |
Language(s): | Spanish |
Published in: | Hormigón y acero, 4th Quarter 1995, n. 198, v. 46 |
Page(s): | 21-25 |
Abstract: |
Footbridge in PlentziaThe footbridge described has replaced an old stone bridge in bad conditions located in the Plentzia Estuary in Vizcaya. It is a bow-string structure made of steel with a free span of 117,60 m. It has two inclined planes which are tied transverselly by box struts. The lower deck is a composite steel concrete structure formed by two longitudinal box girders, transverse beams and a concrete slab with a maximum depth of 0,16 m. The upper arches and the deck are joined by 46 stays hangers made of galvanized helicoidal cables.- |
Available from: |