0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Pairing off

Cable design of the Oresund Crossing high bridge was made more challenging by the fact that the cables are seet in pairs

Medium: journal article
Language(s): English
Published in: Bridge Design & Engineering, , n. 14, v. 5
Page(s): 49-50

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10001308
  • Published on:
    20/01/2002
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine