Optimizing Transparency and Disclosure to Reduce Right-of-Way Acquisition Duration for Construction Projects in Mississippi
Author(s): |
Imad Aleithawe
(Administration Research Engineer, Research Division, Mississippi Dept. of Transportation, P.O. Box 1850, 7th floor, Jackson, MS 39215-1850.)
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, August 2013, n. 3, v. 5 |
Page(s): | 151-158 |
DOI: | 10.1061/(asce)la.1943-4170.0000119 |
- About this
data sheet - Reference-ID
10579741 - Published on:
08/03/2021 - Last updated on:
08/03/2021