Optimizing Transparency and Disclosure to Reduce Right-of-Way Acquisition Duration for Construction Projects in Mississippi
Auteur(s): |
Imad Aleithawe
(Administration Research Engineer, Research Division, Mississippi Dept. of Transportation, P.O. Box 1850, 7th floor, Jackson, MS 39215-1850.)
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2013, n. 3, v. 5 |
Page(s): | 151-158 |
DOI: | 10.1061/(asce)la.1943-4170.0000119 |