Imad Aleithawe
- Optimizing Transparency and Disclosure to Reduce Right-of-Way Acquisition Duration for Construction Projects in Mississippi. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 5, n. 3 (août 2013). (2013):
- Right-of-Way Acquisition Workflow Model to Reduce Acquisition Duration. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 3 (août 2017). (2017):
- Right-of-Way Acquisition Duration Prediction Model for Highway Construction Projects. Dans: Journal of Construction Engineering and Management, v. 138, n. 4 (avril 2012). (2012):