0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods

This publication lists 68 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10576923
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine