Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning
Author(s): |
Vu Hong Son Pham
Nghiep Trinh Nguyen Dang Nguyen Van Nam |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-07-2023-0672 |
- About this
data sheet - Reference-ID
10789115 - Published on:
20/06/2024 - Last updated on:
20/06/2024