Optimizing of Discrete Time-cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm
Author(s): |
Gülçağ Albayrak
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Periodica Polytechnica Civil Engineering |
DOI: | 10.3311/ppci.22156 |
- About this
data sheet - Reference-ID
10729682 - Published on:
30/05/2023 - Last updated on:
30/05/2023