- Optimizing of Discrete Time-cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm. In: Periodica Polytechnica Civil Engineering. :
- A State of Art Review on Metaheuristic Methods in Time-Cost Trade-off Problems. In: International Journal of Structural and Civil Engineering Research, v. 6, n. 1 ( 2017). (2017):
- A Rapid Seismic Risk Assessment Method for Existing Building Stock in Urban Areas. In: Procedia Engineering, v. 118 ( 2015). (2015):
- Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 44, n. 4 ( 2020). (2020):
- A Survey Based Study Of Civil Engineering Education In Turkey. In: Organization, Technology and Management in Construction, v. 6, n. 2 ( 2014). (2014):