Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS
Author(s): |
Yi Tan
Yongze Song Junxiang Zhu Qiang Long Xiangyu Wang Jack C. P. Cheng |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, October 2018, v. 94 |
Page(s): | 328-339 |
DOI: | 10.1016/j.autcon.2018.07.012 |
- About this
data sheet - Reference-ID
10191169 - Published on:
01/12/2018 - Last updated on:
01/12/2018