Optimizing lift operations and vessel transport schedules for disassembly of multiple offshore platforms using BIM and GIS
Auteur(s): |
Yi Tan
Yongze Song Junxiang Zhu Qiang Long Xiangyu Wang Jack C. P. Cheng |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, octobre 2018, v. 94 |
Page(s): | 328-339 |
DOI: | 10.1016/j.autcon.2018.07.012 |
- Informations
sur cette fiche - Reference-ID
10191169 - Publié(e) le:
01.12.2018 - Modifié(e) le:
01.12.2018