Optimizing Financing Cost in Construction Projects with Fixed Project Duration
Author(s): |
S. M. Reza Alavipour
David Arditi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, April 2018, n. 4, v. 144 |
Page(s): | 04018012 |
DOI: | 10.1061/(asce)co.1943-7862.0001451 |
- About this
data sheet - Reference-ID
10174927 - Published on:
11/12/2018 - Last updated on:
11/12/2018