Optimization of Vertical Elevator Movements and Material Storage Locations for High-Rise Building Construction with Overtime Cost Effects
Author(s): |
Chun Huang
C. K. Wong |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Computing in Civil Engineering, January 2019, n. 1, v. 33 |
Page(s): | 04018054 |
DOI: | 10.1061/(asce)cp.1943-5487.0000794 |
- About this
data sheet - Reference-ID
10258220 - Published on:
30/12/2018 - Last updated on:
30/12/2018