Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming
Author(s): |
C. Huang
C. K. Wong C. M. Tam |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, August 2011, n. 5, v. 20 |
Page(s): | 571-580 |
DOI: | 10.1016/j.autcon.2010.11.023 |
- About this
data sheet - Reference-ID
10189964 - Published on:
10/12/2018 - Last updated on:
10/12/2018