0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Optimisation of the TBM drive at the Boßler Tunnel using the observation method and an incremental design and contract development process

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10084056
  • Published on:
    09/10/2018
  • Last updated on:
    18/10/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine