Optimisation of the TBM drive at the Boßler Tunnel using the observation method and an incremental design and contract development process
Author(s): |
Peter Schubert
Kurt Joham Manfred Bauer |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geomechanics and Tunnelling, April 2017, n. 2, v. 10 |
Page(s): | 123-134 |
DOI: | 10.1002/geot.201600079 |
- About this
data sheet - Reference-ID
10084056 - Published on:
09/10/2018 - Last updated on:
18/10/2018