Optimal Setback Planning and Delay Analysisfor HOV Lanes
Author(s): |
Abishai Polus
(Technion-Israel Inst. of Technol., Dept. of Civ. Engrg. and Transp. Res. Inst., Haifa 32000, Israel.)
Israel Reshetnik (Technion-Israel Inst. of Technol., Dept. of Civ. Engrg. and Transp. Res. Inst., Haifa 32000, Israel.) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Transportation Engineering, December 2001, n. 6, v. 127 |
Page(s): | 501-506 |
DOI: | 10.1061/(asce)0733-947x(2001)127:6(501) |
- About this
data sheet - Reference-ID
10634296 - Published on:
29/11/2021 - Last updated on:
29/11/2021