ÖBB Steyrtalbrücke - Belastungsprobe und Langzeitmessungen
Author(s): |
Roman Geier
Moritz Menge Thomas Mack Thomas Petraschek |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Beton- und Stahlbetonbau, August 2016, n. 8, v. 111 |
Page(s): | 505-515 |
DOI: | 10.1002/best.201600025 |
Abstract: |
ÖBB Steyrtalbridge - Load test and long term measurementsAt km 65,621 of the railroad track between Linz and Selzthal the Steyrtalbridge was rebuilt in the years 2013 and 2014. The essential design criterion from the client ÖBB Infrastruktur AG was the endeavor of an optimized bridge under consideration of life-cylce-cost, which among other things despite a bridge length of 182 m can be designed without high-maintenance breather switches. |
Keywords: |
arch bridge interaction long-term measuring monitoring
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10073654 - Published on:
02/10/2016 - Last updated on:
03/10/2016