A novel construction scheduling framework for a mixed construction process of precast components and cast-in-place parts in prefabricated buildings
Author(s): |
Bin Yang
Boda Liu Jianzhuang Xiao Binghan Zhang Zhichen Wang Miaosi Dong |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Building Engineering, November 2021, v. 43 |
Page(s): | 103181 |
DOI: | 10.1016/j.jobe.2021.103181 |
- About this
data sheet - Reference-ID
10628178 - Published on:
05/09/2021 - Last updated on:
05/09/2021